Quad Mirror — 20 ft standard DC block

Two 2×2 quads mirrored around a central skid spine — eight DC blocks sharing one aisle

Overview

Two 2×2 clusters stacked vertically with their skids facing each other in the centre. Each skid serves the cluster beside it — four blocks total.

PCS & MV skid
Quad Mirror — two clusters, skids facing each other in centre
ParameterValue
DC blocks8 × 20 ft (two 2×2 clusters)
PCS & MV skids2 × 40 ft
Section width12.3 m (40.4 ft)
Section height25.0 m (82.1 ft)

Energy capacity

At 2h each skid would need to convert more power than it can handle, so the solver builds Quad Split pairs instead.

DC blockBESS section (8 blocks)Duration
6.25 MWh50 MWh / 12.5 MW4h

Clearance and spacing defaults

Service clearance and spacing used by default. All values are adjustable in BESSLayout.

SettingDefault
DC block door side3.5 m (11.5 ft)
DC block cable end2 m (6.6 ft)
PCS & MV skid3 m (9.8 ft) all sides
Fire separation (between DC blocks of different sections)5 m (16.4 ft)

Cable layout

Each skid serves the cluster beside it. Cable ends face left and right from the clusters, and the skids sit centred between them. At 40 ft each skid has two PCS sections — one per DC column.

Single BESS section footprint

Land area at default clearance. DC doors face outward (top and bottom), cable ends on each side.

Single section

Doors outward top and bottom, cables left and right

523 m²(5,625 ft²)
16.3 × 32.0 m
53.5 × 105.1 ft
Land useValue
Footprint16.3 × 32.0 m (53.5 × 105.1 ft)
Total area523 m² (5,625 ft²)

Multiple sections footprint

Land area for four sections, in a row and in a 2 × 2 grid, at the default spacing.

Clearance
4 × 1 grid

4 sections · 32 DC blocks

2186 m²(23,534 ft²)
68.3 × 32.0 m
224.0 × 105.1 ft
2 × 2 grid

4 sections · 32 DC blocks

2087 m²(22,465 ft²)
33.6 × 62.1 m
110.3 × 203.6 ft